ADV/MATE/AGS-----------------------
choose category
QUIET VOLT
SETUP TIME START PG2
ADV/MATE/AGS/PG2----------------
choose category
LOAD MUST
PG1 START RUN PG3
ADV/MATE/AGS/LS------------------
load start 0 kw
DOWN AGS INC DEC
ADV/MATE/AGS/LS------------------
load start 1 min
delay
DOWN UP INC DEC
GototheADV/MATE/AGSscreenandpressthe
<P2> so key.
AttheADV/MATE/AGS/PG2screen,pressthe
<LOAD START> so key.
Intheload start kwscreen,anAGSstartcommand
willbeissuedwhenthetotalACloadofalltheFXs
connectedtotheMATEexceedsthissettingforthe
loadstartdelay(nextscreen)time.Azerovalue
disables any load start function. <INC> and <DEC>
adjuststhissettingbetween1–50kW.Aerthe
value has been set, press the <DOWN> so key to
get to the load start delay screen.
is setting is the delay time that the total system AC
loadmustremainabovetheloadstartkwsetting(see
previousscreen),beforethegeneratorisstarted.Itis
adjustablefrom1to240minutesusingthe<INC>
and <DEC> so keys. Aer making any adjustments
to the delay time, press the <DOWN> so key to go
to the load stop kw screen.
Load Start KW
Load Start Delay
To open the Load Start screen: